Move to the text

News from Dewa Sanzan Shrine  

It is news about great repair of the Mt. Haguro Five Storeyed Pagoda Reiwa
2023-03-14
Mt. Haguro Five Storeyed Pagoda reroofs 杮 until from the beginning of May, 2023 to the spring of 2025 and constructs it.
In this year, I establish footing with construction during periods from Monday, May 8 to Thursday, November 30.
During the period mentioned above, you cannot see the whole of Five Storeyed Pagoda by footing or a curtain.
I would appreciate your understanding.
※Postscript
A scaffold hangs over the whole Five Storeyed Pagoda than 6/1, and a net is set up.
As for the detailed situation, please see HP, SNS of the Haguro-cho tourist association.

In addition, I reroof the sedge of the important cultural property bell tower at the Haguro mountaintop and perform the construction at the same time.
Reroofing finishes this construction by the end of the age, October, and a scaffold is going to be dismantled in the middle of November.
As the precincts, the bell tower outskirts become small, please be careful on traffic during a construction period.

★About the oblation of the 杮 reroofing, please see the following special page.★

Five Storeyed Pagoda It is 6/5 from the front
It is 6/5 from the Five Storeyed Pagoda side
6/5 mountaintop bell tower (bell)
6/5 mountaintop bell tower (bell) outskirts
Dewa Sanzan Shrine (Mt. Haguro)
+81-235-62-2355
The morning 8: 30 - afternoon 5: To 00
About the mail correspondence of a prayer, the lucky charm,
0
6
1
1
4
6
2
7
Back to TOP